|
The
Quality Control Department has
the responsibility of monitoring
quality from raw material procurement
to the finished article. Important
or critical stages in manufacture
are monitored by a highly qualified
individual. In all other stages
of the process, we have placed
other suitably qualified personnel.
The
head of the department ensures
that the usual smooth functioning
of the department is harmonious
with the other sections of the
company. His position means
he must be responsive and act
whenever there is a problem
with quality, whether it is
from the customer or within
the factory itself.
 |
The
vice-head of the department
is responsible for the hardware
process, control and testing.
His position also involves
the collection and analysis
of data. He subsequently
takes the necessary measures
should there be any errors
or defects. |
In
charge of the 'mini-type packing
machines' is a specially assigned
worker. Their responsibility
is to grade an individual worker's
performance. In charge of the
larger machines, there is an
individual with mirror responsibilities.
Both of them work to the stipulations
of the head of department, filing
their results with their analyses.
Test
Equipment and Facilities
Name:High-Voltage
Testing Instrument
Description:This machine
is used to test home appliances
and packing machines. The test
voltage can be adjusted between
zero and 5kVAC. Alert-active
electricity intension is optional,
such as 0.5, 1, 2, 5, 10, 20mA.
Test time is also adjustable,
ranging from zero to 99 seconds.
The products that can successfully
pass through testing have a
high safety-coefficient. They
will cause no injuries to the
eventual user.
Name:Comprehensive
Test Instrument
Description:This instrument
was designed completely by our
company. It is multi-functional
and has excellent testing capability
for our own equipment. Principal
functions:
1) Analyses working life of
impulse sealers
2) Computes impulse duration
by means of an easily read,
high-precision numeric screen
3) Tests all aspects of the
motor
4) Locates 'bad-touch-point'
of PC board of all sealers
5) Tests all speed-adjustment
boards
6) Tests all transformers
|